This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision | |||
|
powering_it_up [2019/07/29 20:13] atuline |
powering_it_up [2019/07/29 20:16] (current) atuline |
||
|---|---|---|---|
| Line 13: | Line 13: | ||
| Make sure that ALL grounds are connected. | Make sure that ALL grounds are connected. | ||
| + | |||
| + | ===Powering Large Projects=== | ||
| + | * Grounds should be common | ||
| + | * Power the LED's directly from the PS | ||
| + | * Each LED consumes up to 60mA | ||
| + | * Insert power every 5 meters or so. | ||
| + | |||